Widening of Highway 60 in the section between the Elazar Junction and the Neve Daniel Junction.
The project includes rock excavation, shoring, construction of retaining walls, paving of agricultural roads, earthworks and site preparation, infrastructure work, paving, drainage work, rehabilitation of the existing Highway 60, and final development.
The work is being carried out adjacent to a heavily trafficked road, with measures taken to maintain active traffic flow and minimize disruptions for road users.
The project has been underway since 2023, commissioned by the Moriah Jerusalem Development Corporation.
Project Manager: Elad Diamant