Construction of roads and bridges to connect the 1000 Complex to existing roadways.
The project includes the construction of a pedestrian bridge approximately 350 meters in length, spanning over Ayalon Highway and the “Moshe Dayan” train station, connecting directly to the train station. Due to the bridge’s location and the need to minimize impact on train traffic and the main routes of Ayalon Highway, the bridge is constructed with sections of steel combined with concrete segments.
The project also includes the construction of a concrete bridge over Ayalon Highway to double the capacity of the Rabin Bridge, along with road-widening and final development work on Rabin Road.
Additionally, a bridge and ramps were built to connect to Ayalon Highway, creating entrances to the 1000 Complex, along with the expansion of a service road, the establishment of a bicycle path, construction of walls and an underground passage, and completion of infrastructure and final development across all areas of the project.
The project has been underway since 2021, commissioned by Ayalon Highways.