Strengthening and restoration works for the Faran Bridge.
The project included work to reinforce the bridge’s pillars, beams, and deck, utilizing advanced engineering techniques. Additionally, significant crack repairs were conducted, along with the replacement of expansion joints, drainage systems, and the bridge deck.
The work was carried out while maintaining active traffic flow along Highway 90.
The project was completed in 2008, commissioned by the Israel National Roads Company.
Project Manager: Yoni Weisbort