Construction of a Underpass roadway and bridge in Modi’in.
The project included excavation, paving, and development of the road, construction of a beam bridge over the road, building of retaining walls, and infrastructure work to replace an existing intersection with a beam bridge.
The work was conducted in an active urban area, ensuring smooth traffic flow throughout the construction period.
The project was completed between 2011-2013, commissioned by the Ministry of Construction and Housing.
Project Manager: Yoni Weisbort