The 1000 Complex
Infrastructure work for connecting the 1000 Complex to existing main roads. As part of the project, a 350-meter pedestrian bridge was constructed, linking Moshe Dayan Train Station to the complex, incorporating steel and concrete segments for durability and safety.
Additionally, another bridge was built to expand Rabin Bridge, alongside the widening of Rabin Road and surrounding landscape development.
New ramps were constructed for direct access to Ayalon Highways, service roads were expanded, a bicycle path was paved, and retaining walls and an underground passage were built.
All work was meticulously planned to minimize traffic disruption while ensuring the smooth flow of public and private transportation in the area.
Israel, Rishon LeZion
|
Ongoing
Graduation year:
2025